Health, safety, environment & quality

HSE officer: Eng. Mohammed Al-Husseini (OSHA). QA/QC by our sister company Nexana Global.

25,000+safe man-hours
0lost-time injuries since 2023
OSHAcertified HSE officer
ITPinspection & test plan for each activity

Safety

  • Risk assessment before each activity; permits to work for hot work and work at height.
  • Daily toolbox talks on site and PPE for every worker.
  • Segregated work zones in live hospitals and an emergency plan for every site.

Quality control

  • Material approval before ordering and inspection on delivery.
  • An inspection & test plan (ITP) for each activity, with hold points.
  • Pressure, flow, fire-fighting and HVAC system tests before handover.
  • QA/QC by our sister company Nexana Global, to the Saudi Building Code and manufacturer guidance.

Material approval before delivery

  1. Material Approval Request (MAR): datasheet, test certificates, origin, warranty
  2. Sample checked against the specification and BOQ
  3. Consultant or owner approval before the purchase order
  4. Inspection on delivery against the approved sample
  5. Reject non-conforming material and log it in the NCR register

Inspection & test plan (ITP)

ActivityCheck / testAcceptancePoint
ConcreteFormwork & rebar before pouring; slump & cube testsSaudi Building Code SBC 304H
WaterproofingSubstrate, primer, laps; flood testLaps ≥ 10 cm · 24–48 h flood testH
Thermal insulationBoard thickness, density and fixingPer approved materialW
HVAC ductsLeakage test; air balancing (TAB)SMACNA · airflow within ±10% of designH
Isolation roomsNegative pressure, air changes≥ 2.5 Pa · ≥ 12 ACH (ASHRAE 170)H
Fire-fightingHydrostatic pressure test200 psi · 2 h · no drop (NFPA 13)H
Plumbing & drainagePipe pressure; drainage leak testPer specificationW
ElectricalInsulation resistance, continuity, earthingSaudi Building Code SBC 401H
FinishesLevel; paint and epoxy thicknessPer manufacturerW
HandoverSnags, as-built drawings, O&M manuals, warrantiesAll snags closedH

H Hold point: work stops until the consultant or owner signs.   W Witness point: the client is notified. Each project's specification overrides these values.

That is our promise to you: to earn your trust on the first project, so it becomes the start of what follows.

Eng. Raed bin Hashem Noor – Owner & General Manager